|
Community Development
What does Community Development do?
Community Development includes the Long Range and Current
Planning that documents community goals, plans and visions and ensures
that new development meets these goals. They coordinate all Planning
Commission related items, such as meetings and documentation. They ensure all
Building & Zoning Code Compliance and handles all building inspections
and signs. They maintain and provide all property information by coordinating
the Town GIS / MIS Information Systems. They also provide public
assistance and growth impact analysis.
What is property zoning and what is my zoning?
Property zoning guides
how you or your neighbor can develop your property. Following is a brief
description of some zoning districts and examples of general locations (zoning
maps and land use schedules, 8 1/2 x 11 are available in the Community
Development Department starting at $3.50):
-
C-1,
Light Commercial: sales and service facilities; i.e., Summit Place
Shopping Center, most of the business west of Hwy. 9
-
C-2, Heavy Commercial:
likely to have large vehicles associated with a service or production
operation; i.e., Resort Express, UPS
Government :
schools and recreation
Open Space :
parks and recreation
PUD (Planned Unit Development) :
provides opportunity for mixed-use development; i.e., Eagles Nest
Subdivision, Town Center, Silverthorne Factory Stores
R-15 :
Fifteen (15) residential dwelling units per acre; i.e., Blue River
Apartments and Sierra Madre
R-6 : Six
(6) residential dwelling units per acre; i.e., Willowbrook, Willow Creek
Highlands, Beaver Valley Subdivision
R-2 : Two
(2) residential dwelling units per acre; i.e., Blue River Mesa, Ptarmigan
Trail Estates
River Front Mixed Use :
a combination of uses intended to promote the Blue River; i.e., most of
the property east of Hwy 9 along the Blue River
Blue River Overlay District :
zoning that is superimposed over other zoning districts; intended to
promote unifying architectural design elements and to preserve scenic
views
Do I need a sign permit?
Yes. All signs and banners in Town need a permit. Contact Melody Hillis at 262-7367.
What is the population of Silverthorne?
Silverthorne is the largest town in Summit County with a population of
about 3,520 as of January, 2003. We have an 76% year-round resident home
occupancy rate. Summit County’s year-round population is about 25,400 and has
a peak population (high tourist season in winter and summer) of an estimated
138,278.
What are the water and sewer tap fees?
Tap fees are monies which are collected for and used to build and/or
upgrade Town water and sewer related needs such as well drilling, water rights
acquisition, pump house and tank facilities construction, treatment plant
expansions and upgrades as well as other system infrastructure related
improvements. Tap fees are required and are collected to allow access to and
use of the Town’s municipal water and sewer systems. (The term Tap, as
described in this section, is NOT related to or synonymous with the act of
making the actual physical connection or “tap” into water or sewer mains,
which is also a common use of the term tap.)
Tap fees are
also commonly referred to as System Development fees. A Tap itself, also
referred to as an Equivalent Residential Unit (EQR) is defined as the amount
of water used by an average single family residence or its equivalent. This
determination and definition is the basis of the Use Classification Schedule
which has been adopted by the Town of Silverthorne as well as the neighboring
entities of the Town of Dillon, the Dillon Valley Metro District and the
Buffalo Mountain Metro District (which services the Wildernest area.) The
number of taps owned is also used for the determination of regular water and
sewer billings.
Payment of tap
fees is due at the time of Building Permit issuance. Currently in 2010, tap
fees cost $6200 for each water EQR and $5400 for each sewer EQR. Thus, a
combined water and sewer tap would cost $11,600 in 2010. Tap
fees are typically a one time initial fee, however additional taps may be
assessed if a use for a particular property changes and necessitates that more
are required.
A single
family residence (SFR) typically requires one water EQR and one sewer EQR,
however, beginning with building permits issued in 2007, all homes with more
than 3 bedrooms or 3 bathrooms will be assessed an additional .1 EQR over 1
EQR. For example, a residential building permit for a four bedroom and
four bathroom home will be assessed 1.2 EQR. Additional EQRs may also be assessed depending on certain things such as
accessory apartments, multiple kitchen facilities or other possible scenarios.
Multi family residential projects such as condominium complexes intended for
short term rentals have different EQR rates based on the number of bedrooms
and bathrooms proposed. Commercial tap fees are generally based on the size of
the project and the type of uses proposed for a particular business. There are
many different fee rate categories for commercial projects. A comprehensive
listing of EQR rates can be found within the Town of Silverthorne’s water and
sewer Use Classification Schedule. Additional questions related to tap fees
can be directed towards the Town Engineer at (970) 262-7354.
Can I sell half my lot?
It depends on your zoning district, and if you would have the required
minimum lot size. Lot sizes are determined in the subdivision process. Please
make an inquiry to the Planning Department to determine the regulations for
your property.
What is the flood plain designation for my lot?
Most, if not all
lending institutions require as a condition of loan or refinance approval that
flood insurance be purchased for properties and/or structures which are
located within the Federal Emergency Management Agency’s (FEMA) mapped
floodplain (also referred to as the Special Flood Hazard Area). Prior to
approving a loan or refinance, the lending institution will typically utilize
a third party flood determination company to designate whether the property
and/or structure appears to be within the FEMA mapped floodplain, and hence
subject to flood insurance requirements. This determination is NOT made
by the Town, but rather by a third party company working on behalf of the
lender. For liability reasons, the Town cannot make actual determinations on
whether a property or structure is located within or outside of a FEMA mapped
floodplain.
When new
projects or additions are proposed however, the Town will utilize FEMA mapping
in order to check whether the project appears to be in the FEMA floodplain. If
Town staff observes that the project appears to be in the floodplain, then the
Town’s role is to ensure that both local and FEMA regulations requirements are
satisfied prior to or as conditions of project approval. This often requires
additional technical studies and steps which are done and paid for by the
developer.
The Town keeps
on file FEMA mappings and related studies for information and reference for
the general public. This includes FEMA Flood Rate Insurance Maps (FIRM) and
Flood Insurance Studies (FIS). Additional questions related to the NFIP
(National Flood Insurance Program), FEMA floodplain mapping, or requirements
for construction within the floodplain may be directed to the Town Engineer at
(970) 262-7354.
Do I need a building permit to...?
Most construction requires a building permit. Storage sheds larger than
120 square feet and fences higher than 6 feet require building permits,
anything less doesn’t. Please contact us at 262-7360 for more details.
Are my development / building plans ready yet?
To understand this time frame, it’s helpful to understand the planning
process. Community Development deals with project plan reviews and
building plan reviews. Plans for a four-plex residential unit, subdivision,
re-subdivision, annexation, rezoning, variance, conditional use, site plan
review or commercial project must go through the project review process. Plans
must be submitted for Planning Commission and Town Council review. Larger
projects usually have a sketch, preliminary and final review phase before both
the Commission and the Council; most projects only have one final review;
smaller projects (under ½ acre) may be dealt with at staff level. Therefore,
some project reviews may take a few weeks to complete, while others may take
several months; it depends on the project’s size and scope.
Once the Town
approves residential subdivisions and commercial projects, a building permit
may be obtained through the building plan review process. At
least two (2) sets of plans must be submitted with plan-check fees. Town
Planning, Engineering and Building staff as well as the local Fire Department
review the plans. Plan reviews will be completed based upon workload, and we
will contact applicants when building permits are ready to be picked up or if
we’ve identified any problems that need to be corrected. Building permit fees,
impact fees, excise tax and water/sewer tap fees are paid when the building permit is
issued. Please call us at 262-7360 for more details.
|